top of page

Regular Inspection and Technical Maintenance of Natural Gas Engines

4.1 Maintenance period and specifications of industrial power natural gas

engines

1. Maintenance period of industrial power natural gas engines

First inspection: after a new engine has run for 50 hours

Routine inspection(P) : once every 250 operation hours

The first level maintenance (WD1): once every 500 operation hours

The second level maintenance (WD2): once every 1000 operation hours

The third level maintenance (WD3): once every 2000 operation hours

The fourth level maintenance (WD4): once every 4000 operation hours

3. Specifications for spare parts and oil products The engine user must purchase special accessories and special engine oil from the special Weichai maintenance service center, in order to guarantee the good service of the equipment and to extend the service life.

4. Maintenance specification After purchasing a Weichai industrial power product and mounting it well, the user shall inform the special Weichai maintenance service center and ask a technician for debugging the equipment. In case of any fault during the warranty period, the user shall inform the special Weichai maintenance service center and ask for services.

We not only can provide natural gas generator, but also provide diesel generating sets. Contact us by email: sales@dieselgeneratortech.com

Single post: Blog_Single_Post_Widget
bottom of page